Turkish Property Handover Checklist: What to Inspect Before Moving In

Taking possession of a completed home is an important practical step, not simply a moment to receive keys. A careful property handover checklist Turkey buyers can use helps identify visible defects, confirm essential services, and clarify who will resolve outstanding items. Walk through every room, test accessible fixtures, and record observations before signing documents that confirm acceptance. Keep communication calm and specific, and agree on responsibilities and dates in writing. This guide focuses on the individual home’s condition and transfer of access, not structural risk assessment or buying an unfinished property.
Prepare Before the Appointment
Arrange a mutually convenient inspection when there is adequate daylight and enough time to visit every room without rushing. Ask the seller or developer which documents, manuals, keys, and service details will be available. Bring a phone or camera, a small torch, a notepad, and a simple list of rooms and fixtures. If language could complicate discussions, arrange a trusted interpreter before the appointment. Confirm whether utilities are active, since testing taps, heating, cooling, and appliances may depend on access. Avoid assuming that a finished appearance means every item is complete. Decide who will record findings and who can approve follow-up arrangements.
Inspect Walls, Floors, and Ceilings
Move through the property systematically, looking for visible marks, cracks in finishes, stains, uneven paint, chipped tiles, and damaged flooring. Check corners, skirting boards, ceilings, and areas behind doors where workmanship problems can be less obvious. Distinguish a surface blemish from a concern requiring professional assessment; do not diagnose structural safety during a routine handover. Photograph each issue from a wider view and a closer angle, then note its exact room and location. For example, record “bedroom, wall beside window” rather than “paint problem.” Ask the responsible party to confirm whether repairs, cleaning, or further inspection will follow, and by what date.
Test Doors, Windows, and Storage
Open and close each accessible door and window, checking handles, locks, hinges, seals, and smooth operation. Look for visible scratches, cracked panes, gaps, or damage to frames, and note any difficulty securing an opening. Inspect wardrobe doors, cupboard hinges, drawer runners, and built-in storage for alignment and complete fittings. Test shutters or screens where installed, without forcing stiff mechanisms. Confirm that external doors lock with the keys provided and that every key corresponds to a specific lock. If an item sticks, describe the action needed rather than writing only “faulty.” Agree whether adjustment or replacement is expected, and retain a record of the response.
Check Kitchens and Bathrooms
Run each tap briefly, observe water flow, and look beneath accessible sinks for visible drips. Flush toilets and check that basins, showers, and baths drain without obvious pooling. Inspect sealant, tiles, mirrors, cabinets, and visible fittings for damage or incomplete finishing. In the kitchen, test cupboard doors and drawers, and confirm that supplied appliances match the agreed inventory. Do not dismantle fittings or operate equipment you cannot use safely. If a utility is not connected, record that testing was unavailable rather than treating the item as verified. Photograph leaks or defects promptly, and ask the seller or developer to confirm the repair plan in writing.

Review Electrical and Climate Fixtures
Test accessible light switches and a selection of outlets using a safe, suitable device, if permitted. Check visible light fittings, ventilation controls, and installed heating or cooling equipment using their normal controls. Notice unusual noises, missing covers, loose fittings, or controls that do not respond. Avoid opening electrical panels or attempting repairs; refer uncertain issues to a qualified professional. Ask how climate systems operate and whether filters or routine servicing need attention. Record which equipment was tested and any limitations, especially if electricity was unavailable. A clear note such as “living room air conditioner did not start during test” supports a focused follow-up instead of vague disagreement later.
Confirm Meters and Essential Services
Locate accessible electricity, water, and gas meters, where applicable, and record their readings with photographs. Confirm which meter serves the home and ask how account transfers or activation should be arranged. Never interfere with sealed equipment or attempt to operate unfamiliar valves. Note whether heating, hot water, internet infrastructure, and other expected services are available at handover. Ask for the relevant provider details and any account references the responsible party can share. If readings cannot be checked, write down why and agree who will confirm them later. These records provide a practical starting point for service administration and help distinguish existing readings from later household consumption.
Collect Keys, Manuals, and Documents
Count keys and identify what each one opens, including entrance doors, storage areas, mailboxes, and shared access points. Test them where appropriate and ask whether any copies remain with the seller, developer, or building management. Collect appliance manuals, warranty information, maintenance instructions, and available service contacts. Confirm which items are included in the home and compare them with the agreed inventory or handover paperwork. Request building access information and guidance for managing shared facilities, if relevant. Keep documents together in a secure folder, with digital copies for convenience. Do not rely on verbal assurances about missing items; record what is outstanding and who will provide it.
Record Defects and Agree Follow-Up
Create a numbered list of each outstanding item, describing its location, observed condition, and requested action. Attach photographs with clear filenames and keep copies of messages, inspection notes, and relevant paperwork. Review the list with the seller or developer before leaving, and invite corrections if either party disputes a description. Agree in writing who is responsible, the expected completion date, and how access for repairs will be arranged. Avoid marking unresolved work as completed merely to speed up the appointment. If acceptance documents require a signature, understand what the wording confirms and seek appropriate advice when uncertain. Request confirmation when agreed work is finished.
Frequently Asked Questions
When should I inspect the home?
Inspect before confirming handover acceptance, when utilities and access are available. Allow enough time to check every room and record findings without rushing.
What should I photograph?
Photograph visible damage, unfinished work, meter readings, and relevant fixtures. Include a wider image showing location, then a close view that makes the condition clear.
Should I sign if defects remain?
Read the document carefully and understand what your signature represents. Record outstanding defects and agreed remedies in writing, and seek advice if wording is unclear.
What if services are unavailable?
List the systems you could not test and explain why. Agree who will arrange testing later, when it will happen, and how results will be shared.
Do I need to test every appliance?
Check supplied appliances safely against the agreed inventory. Note unavailable power, missing manuals, visible damage, or equipment that fails to operate during ordinary use.
How should repairs be tracked?
Use a numbered defect list with photographs, responsible parties, and target dates. Keep written updates and confirm completion after checking the agreed work.
Make Handover Clear
A thorough inspection turns handover into a documented process rather than a rushed exchange of keys. Check rooms, fixtures, services, meters, and included items, while distinguishing tested equipment from anything unavailable. Record visible defects precisely, share the list with the responsible party, and agree written actions and dates. Keep copies of readings, photographs, manuals, and correspondence for future reference. If a document or repair commitment is unclear, pause and ask for clarification before relying on it. A calm, organized approach helps international buyers manage the practical transition into their completed home and establish clear expectations with the seller or developer.